Copper Mountain Water & Sanitation
Rules & Regulations - Second Edition
ARTICLE 1
GENERAL - Click Sub-heading to view section in HTML format.
1-1 Scope
1-2 Purpose
1-3 Services and Facilities
1-4 Area Served
1-5 Usage, Titles, and Cross References
1-6 Amendments; Repeal; Additions
1-7 Prior Offenses; Contracts Not Affected
1-8 Severability
1-9 District System
1-10 Service Outside the District
1-11 Connection Required
1-12 Duty to Report
1-13 Notice of Excavations
1-14 No Damages for Failure to Enforce
ARTICLE 2
DEFINITIONS
2-1 Abandon
2-2 Actual Costs
2-3 Board or Board of Directors
2-4 BOD
2-5 CDPHE
2-6 CFR
2-7 Contractor
2-8 District
2-9 District Engineer
2-10 District System
2-11 EPA
2-12 Foreign Materials
2-13 Frontage Extensions
2-14 Groundwater
2-15 Inclusion Fee
2-16 Industrial Wastes
2-17 Inspection Fees
2-18 Licensed Contractor
2-19 Main
2-20 Main Extension
2-21 Manager
2-22 NPDES
2-23 Permitted Premises
2-24 Person
2-25 POTW
2-26 Private Sewer System
2-27 Private Water System
2-28 Property Owner
2-29 Record Drawings
2-30 Rules and Regulations
2-31 Sanitary Wastewater
2-32 Service
2-33 Service Lines
2-34 Sewage
2-35 Sewer/Sewerage System
2-36 SFE
2-37 Special Service Fees
2-38 Subsurface Structures
2-39 Surface Water
2-40 Swimming Pool Discharge
2-41 Tap or Service Connection
2-42 Tap Fee
2-43 Tap Owner of Record
2-44 Tap Permit
2-45 Technical Standards and Specifications
2-46 TSS
2-47 Turn-off/Turn-on Fees
2-48 Unauthorized Tap or Service Connection
2-49 User
2-50 Wastewater
2-51 Water System
ARTICLE 3
ENFORCEMENT AND ADMINISTRATION
3-1 District Agents and Representatives
3-2 Right of Entry for Inspections and Emergency Corrective Measures
3-3 Suspension or Termination of Service
3-4 Cure of Violations
3-5 Appeals
3-6 Penalty Charges
3-7 Tap Owner of Record Responsible
3-8 Separate Violations
3-9 Civil Damages
3-10 Injunctive Relief
3-11 Remedies Cumulative
3-12 When Property Owner Liable for Excavation and Repair
ARTICLE 4
INCLUSIONS
4-1 Required Submittals
4-2 Procedure
4-3 Conditions of Inclusion
ARTICLE 5
SERVICE APPLICATIONS AND PERMITS
5-1 Permit Required; Application
5-2 Approval Standards; Revocation
5-3 Expiration
5-4 Non-Transferability of Tap Permit or Tap Fee
5-5 Multiple Use of Tap Prohibited
5-6 Installation Standards
5-7 Tap Sizing
5-8 Voluntary Disconnection/Abandonment
5-9 Tap Allocations
5-10 Swimming Pool Use
5-11 Extra-Territorial Service
5-12 No Joining of Taps
5-13 Industrial Users
5-14 Silver Reclaim
ARTICLE 6
MAIN Extension & Other Improvements
6-1 Approval Required; Improvements Agreement
6-2 Location
6-3 Deeded Rights-of-Way and Easements
6-4 Right of Way Acquisition Costs
6-5 Design and Construction
6-6 Plan Review and Approval
6-7 Construction Observation
6-8 Conditional Acceptance
6-9 Maintenance and Repair
6-10 Acceptance for Maintenance (Final Acceptance)
6-11 District System Improvements
ARTICLE 7
FEES AND CHARGES
7-1 General
7-2 Tap Fees
7-3 Inspection Fees
7-4 Inclusion Fees
7-5 Special Services Fees
7-6 Turn-Off and Turn-On Fees
7-7 Wastewater Service Charges
7-8 Water Service Charges
7-9 Disconnection/Reconnection Charges
7-10 Cure Charges
7-11 Civil Fines Pass Through
7-12 Delinquency Charges; Collection Costs; Lien
7-13 Miscellaneous Costs and Expenses
7-14 Withholding Approvals, Acceptances, and Permits
7-15 Liability for Payment
7-16 Revocation of Service
7-17 Variance Fee
7-18 Miscellaneous Costs and Expenses
ARTICLE 8
PROHIBITIONS
8-1 General
8-2 Separate Violations
8-3 Criminal Statutes
8-4 Prohibited Discharges
8-5 Federal and State Pretreatment Standards
ARTICLE 9
USER REQUIREMENTS
Part A Services
9A-1 Service Lines
9A-2 Water Meters
9A-3 Interceptors (Oil, Grease and Sand Traps)
9A-4 Swimming Pools
9A-5 Car Wash Holding Tanks
9A-6 Private Disposal Systems
9A-7 Lift Stations
9A-8 Certain Drains Prohibited
9A-9 Cesspools and Septic Tanks
9A-10 Changes in Use, Equipment or Service
9A-11 Hydrant Use
9A-12 Special Services
9A-13 Construction Consultants
Part B Construction Standards
9B-1 General Construction Standards
9B-2 Required Submittals
9B-3 Stop Work Orders
9B-4 Cure of Defects
9B-5 Fees
9B-6 Relocation of District Facilities
Part C Interceptor Design and Installation Standards
9C-1 General
9C-2 Engineering Review
9C-3 Design Standards
9C-4 Installation
APPENDIXES
Appendix A - Fees and Charges
Appendix B - Cross Connection Control Regulations
Appendix C - Inclusion Petition Form
Appendix D - Memorandum of Understanding
Appendix E - Oil, Grease and/or Sand Interceptor Maintenance Procedure
Appendix F - Application for Permit
|